Loading
זעמל - Mayor Mamdani Announces 10,000 New ACS Vouchers for Low-Income Families   |  זעמל - Slovakia: Hundreds of Yidden who traveled for the yahrtzeit of the holy Chasam Sofer zy"a participate in a grand Hachnasas Sefer Torah on the stree..   |  זעמל - Jerusalem - Marking the yahrzeit of the "Sanigoron Shel Yisroel..   |  בקיצור - Immigrant Worker in Saudi Arabia Sentenced to Death for Social Media Post Mocking Muhammad   |  בקיצור - A Delta Airbus A350 and an Air Canada Boeing 777 collided on the runway at Los Angeles International Airport, causing damage to a wing of the Airbus aircraft.   |   זעמל - Mayor Mamdani Announces 10,000 New ACS Vouchers for Low-Income Families   |  זעמל - Slovakia: Hundreds of Yidden who traveled for the yahrtzeit of the holy Chasam Sofer zy"a participate in a grand Hachnasas Sefer Torah on the stree..   |  זעמל - Jerusalem - Marking the yahrzeit of the "Sanigoron Shel Yisroel..   |  בקיצור - Immigrant Worker in Saudi Arabia Sentenced to Death for Social Media Post Mocking Muhammad   |  בקיצור - A Delta Airbus A350 and an Air Canada Boeing 777 collided on the runway at Los Angeles International Airport, causing damage to a wing of the Airbus aircraft.   |  

Traffic Delays Expected After Old Route 59 Bridge Section Collapses In Controlled Demolition.

June 9th,

0 273
Main image for Traffic Delays Expected After Old Route 59 Bridge Section Collapses In Controlled Demolition.

Videos


Demolition crews have successfully brought down the first section of the old Route 59 Bridge over South Pascack Road, marking a significant milestone in the ongoing Route 59 Bridge Replacement Project in Spring Valley. Video from the scene captures the aging structure being carefully dismantled as construction teams continue efforts to modernize the critical transportation corridor.

Officials say the bridge replacement project is designed to improve safety, traffic flow, and long-term infrastructure reliability for drivers who use the route daily. The controlled demolition represents one of the most visible phases of the project, with crews working to remove outdated sections before construction of replacement components continues.

Motorists are being advised to expect delays throughout the day as work progresses and traffic management measures remain in place around the construction zone. Local authorities are encouraging drivers to plan ahead and allow additional travel time while demolition and reconstruction activities continue.